Skip to main content

Box 2

 Container

Contains 28 Results:

Guaranteed Annual Wage, 1947

 File — Box: 2, Folder: 11
Scope and Contents

Meyer; letters regarding guaranteed wage reports routine- chiefly about receival of report (thank you notes)

Dates: 1947

NWLB Administrative and General Matters, Reports, etc. File #2, 1943

 File — Box: 2, Folder: 12
Scope and Contents Correspondents: Meyers, George Taylor (NWLB), William A. Waldron (NWLB). Correspondence regarding decision to sign affidavit (affidavit says that if Meyer faces unnecessary pressure to divulge or to procure information in connection with the US War Program- that I'll inform my immediate supervisors of this and notify the investigations office of the Office for Emergency Management). Coal dispute and relationship to the Wage Stab. Program (possible claim under Fair Labor Standards Act under...
Dates: 1943

NWLB Administration and General Matters Reports etc. File #1, 1943

 File — Box: 2, Folder: 13
Scope and Contents Letters and telegrams- correspondents: Lloyd Garrison and Meyer Davis, Taylor (1942-43). Correspondence routine regarding personal appointments of Meters to various positions, data, thank you notes informational requests. Also, recommendation of Sidney Cohn as arbitrator to a case Meyer couldn't handle, resignation of position as Assoc. Mb. of the NWLB and appointment as Mb. of the NY Regional War Labor Board; NWLB Decentralization Program; Acceptance letter Meyer (Assoc. Mb. NWLB). Also...
Dates: 1943

NWLB Wash. Administrative and General,, 1945

 File — Box: 2, Folder: 14
Scope and Contents

Correspondents include: William Brody (Personnel Director NWLB) (1945) and Meyer, Lloyd K. Garrison (Acting Ch. NWLB). Correspondence regarding Official Record of Personnel Action covering appointments with the NWLB; position as Ch. of committee to study the subject of guaranteed wages for the War Mobilization Advisory Bd.; continuation of appointment with NWLB as ad-hoc Panel Ch. with National as opposed to regional.

Dates: 1945

[No title], 1943

 File — Box: 2, Folder: 15
Scope and Contents

Correspondence concerning routine (bills), receipt of check proposals for --- panel members, NWLB, request for compensation for per diem; Moving Picture Machine Operators Union v. Kingsbridge Theater. Also, rough draft of Hoffman Beverage Company and Drivers and Helper U Inc. reports and recommendation of Hearing Offices and memo of appeals regarding methods of pay.

Dates: 1943

1943-NWLB Compensation, Travel, etc.

 File — Box: 2, Folder: 16
Scope and Contents

Including routine correspondence of Meyer with various staff of travel authorization Office for Emergency Management vouchers (per diem and subsistence items) and letter stating amount of reimbursements of expenses (treasury checks at one time included with this letter 1943).

Dates: 1918-1950

NWLB Fiscal and Travel, 1944-1945

 File — Box: 2, Folder: 17
Scope and Contents

Forms: record of official travel; travel authorization (OEM); request for compensation for per diem personnel; vouchers for per diem and/or reimbursement of expenses incident to official travel; vouchers; telegrams; letters regarding claims for reimbursement

Dates: 1944-1945

Region II, NWLB, 1944-1945

 File — Box: 2, Folder: 18
Scope and Contents Correspondents include Harry Frumenman (Committee Ch. NWLB); Milton Rubin (Committee Mb. NWLB); William S. Hilger (Sub-Regional Director #9 UAW, CIO); Walter Gellhorn (Regional Vice Ch. NWLB); Maw J. Miller (Assignment Officer, NWLB). Correspondence concerns: investigation of personnel needs of private individual; metal trade rates, City of Lockport; retroactive date in first contract cases, proposed public mbs. (NWLB). Memo release of NWLB moving of offices, also mss. Notes of letter (ND)...
Dates: 1944-1945

Waterfront EEs Assn. Series of Additional Cases, File #2,, 1945

 File — Box: 2, Folder: 19
Scope and Contents

letters regarding Waterfront Er's Assoc. of California and International Longshores and Warehouses Union- regarding Board decline of jurisdiction over case to Leonard Berliner, Director, Disputes Division NWLB, from Meyer

Dates: 1945

Consolidated Edison (CE) 1942. Consolidated Ed. Of NY vs. International Brotherhood of Electrical Workers and Brotherhood of Consolidated Edison EEs., 1941-1943

 File — Box: 2, Folder: 20
Scope and Contents

Report of the Hearing Commission, Collective Bargaining Contract, and memo on behalf of CE of NY with Appendix A Report and findings of Meyer, Hearing Commissioner issues. "Mbs. should receive construction work undertaken by the Co. (a) when the equipment moowed is dead or not connected with an electrical outlet (b) when other building trades are employed," (miss. notes regarding the case).

Dates: 1941-1943