Skip to main content

American Locomotive Company and United Steelworkers of America Hearing before the U.S. Wage Stabilization Board Transcript

 Collection
Identifier: 5067

Abstract

Transcript of the hearing before the Wage Stabilization Board, 1952. American Locomotive Company and the United Steelworkers of America.

Dates

  • 1952

Language of Materials

Collection material in English

Conditions Governing Access

Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.

Conditions Governing Use

This collection must be used in keeping with the Kheel Center Information Sheet and Procedures for Document Use.

Biographical / Historical

This was a panel hearing conducted under the Disputes Procedures of the Wage Stabilization Board relating to the terms of a renewed contract between the parties. Since the American Locomotive Company was primarily a steel fabricating company, and its contract with the United Steelworkers of America did not expire until January 31, 1952, the parties agreed to con-tinua negotiations rather than take part in the hearings of the Steel Industry Board earlier in 1952.

But the parties were unable to reach an agreement and they returned to the Board. A procedural hearing was held in Washington, D. C. on April 22, 1952. At this meeting it was decided to hold separate hearings on each of the three cases before a single panel. The panel members were:

Public Members Donald K. Strauss, chairman William A. Hazell

Labor Members Benjamin Fischer James S. Killen

Industry Members Virgil Day

George Myers

The union presented a list of 22 demands, approximately the same issues involved in the Steel Industry Dispute; a general wage increase, a guaranteed annual wage, paid holidays, inequities, shift and geographical differeatials, overtime and improved vacations. One particular problem was the request by the union for a company wide contract which the company opposed on the ground that the plants were not similar.

Hearings were held in New York City from May 21, 1952 to June 27, 1952.

Extent

1 cubic feet

Title
American Locomotive Company and United Steelworkers of America Hearing before the U.S. Wage Stabilization Board Transcript
Status
Completed
Author
Compiled by Kheel Staff
Date
March 07, 2019
Language of description
Undetermined
Script of description
Code for undetermined script

Revision Statements

  • 02/23/2024: This resource was modified by the ArchivesSpace Preprocessor developed by the Harvard Library (https://github.com/harvard-library/archivesspace-preprocessor)

Repository Details

Part of the Kheel Center for Labor-Management Documentation & Archives Repository

Contact:
227 Ives Hall
Ithaca NY 14853