American Locomotive Company and United Steelworkers of America Hearing before the U.S. Wage Stabilization Board Transcript
-
No requestable containers
-
Ask a Question
Abstract
Transcript of the hearing before the Wage Stabilization Board, 1952. American Locomotive Company and the United Steelworkers of America.
Dates
- 1952
Language of Materials
Collection material in English
Conditions Governing Access
Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.
Conditions Governing Use
This collection must be used in keeping with the Kheel Center Information Sheet and Procedures for Document Use.
Biographical / Historical
This was a panel hearing conducted under the Disputes Procedures of the Wage Stabilization Board relating to the terms of a renewed contract between the parties. Since the American Locomotive Company was primarily a steel fabricating company, and its contract with the United Steelworkers of America did not expire until January 31, 1952, the parties agreed to con-tinua negotiations rather than take part in the hearings of the Steel Industry Board earlier in 1952.
But the parties were unable to reach an agreement and they returned to the Board. A procedural hearing was held in Washington, D. C. on April 22, 1952. At this meeting it was decided to hold separate hearings on each of the three cases before a single panel. The panel members were:
Public Members Donald K. Strauss, chairman William A. Hazell
Labor Members Benjamin Fischer James S. Killen
Industry Members Virgil Day
George Myers
The union presented a list of 22 demands, approximately the same issues involved in the Steel Industry Dispute; a general wage increase, a guaranteed annual wage, paid holidays, inequities, shift and geographical differeatials, overtime and improved vacations. One particular problem was the request by the union for a company wide contract which the company opposed on the ground that the plants were not similar.
Hearings were held in New York City from May 21, 1952 to June 27, 1952.
Extent
1 cubic feet
Quantity:
1 linear ft.
Forms of Material:
Transcripts.
General
- Contact Information:
- Kheel Center for Labor-Management Documentation and Archives Martin P. Catherwood Library 227 Ives Hall Cornell University Ithaca, NY 14853 (607) 255-3183 kheel_center@cornell.edu http://www.ilr.cornell.edu/library/kheel-center
- Compiled by:
- Kheel Staff, January 31, 2013
- EAD encoding:
- Kheel Staff, March 07, 2019
- Title
- American Locomotive Company and United Steelworkers of America Hearing before the U.S. Wage Stabilization Board Transcript
- Status
- Completed
- Author
- Compiled by Kheel Staff
- Date
- March 07, 2019
- Language of description
- Undetermined
- Script of description
- Code for undetermined script
Revision Statements
- 02/23/2024: This resource was modified by the ArchivesSpace Preprocessor developed by the Harvard Library (https://github.com/harvard-library/archivesspace-preprocessor)
Repository Details
Part of the Kheel Center for Labor-Management Documentation & Archives Repository
227 Ives Hall
Ithaca NY 14853