Item 6: Billboard describing the construction of the Franklin Falls Dam, Franklin, N.H., 1941
Scope and Contents
Billboard describing the construction of the Franklin Falls Dam, Franklin, N.H. Gelatin silver print snapshot. Image depicts a billboard that describes the construction of the Franklin Falls Dam in Franklin, N.H. Billboard shows the process of construction and gives statistics regarding the project. Note the probable completion date of June 30, 1942. The dam was constructed by the Army Corps of Engineers for flood control of the Pemigewasset River; construction began in November 1939 and was completed in October 1943. The Pemigewasset River joins with the Winnipesaukee River about three miles downstream to form the Merrimack River. This photo was taken on May 20, 1941. 13.25 x 8.5 cm.
Format: black and white photograph.
Dates
- 1941
Language of Materials
Collection material in English
Conditions Governing Access
Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.
Extent
8.78 cubic feet
Format:
black and white photograph
Repository Details
Part of the Kheel Center for Labor-Management Documentation & Archives Repository
227 Ives Hall
Ithaca NY 14853