Pipe Line Case, 1943-1944
Scope and Contents
Transcontinental pipe lines (nic. The George Bolz Dredging Co., International Hod Carriers, Cominon Laborers Union, International Union of Operating Engineers, United Association of Journeymen Plumbers and Pipe Fitters, Teamsters Preliminary Facts, Dissenting Opinion by Ind. Mb. Issue- G. Bolz Dredging was a sub-contractor employed specifically to construct the Miss. River Crossing (operated strictly on a strictly u basis) (open-shop basis, result picketed and struck creating a conflict during war years)- adjoining Missouri Section was being constructed by Oil States Construction Co. on letters regarding Missouri River Pipeline Crossing, routine matters correspondence between panel mbs. relating to the case. Also, telegrams. Correspondents include: NP Feinsinger (NWLB); Robert H. Zetzman (Colgate-Palmolive Pest Co.); James A. Wilson (International Labor Office); Meyer (1943-1944).
Dates
- 1943-1944
Language of Materials
Collection material in English
Conditions Governing Access
Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.
Extent
4 cubic feet
Repository Details
Part of the Kheel Center for Labor-Management Documentation & Archives Repository
227 Ives Hall
Ithaca NY 14853