Item 1: Click for Image
Scope and Contents
These tracks used for all passenger trains as well as freight transfers. Building partially seen in lower left corner is tower "A." Rail to left of tower has been removed from service, leaving only the two tracks on the right side of the building to handle all traffic in and out of the terminal from this end or for through movements in the terminal. Buildings in this area are the Denver Post Warehouse, J.I. Case Building, Weicker Transfer Co., and the new post office terminal annex. Below retaining wall in foreground of picture is Cherry Creek. On No.1 track about halfway between the 16th Street viaduct in the foreground and 15th Street, there is a curve in the track , a dwarf signal and switch to route trains out on one of the twwo main tracks crossing the bridge over Cherry Creek.
Dates
- 1960
Language of Materials
Collection material in English
Conditions Governing Access
Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.
Extent
4.5 cubic feet
Repository Details
Part of the Kheel Center for Labor-Management Documentation & Archives Repository