Skip to main content

Switching at the Fruit Vale Cannery in West Oakland Yard, 1960

 File — Box: 54, Folder: 105a

Scope and Contents

Shows the switching operation at the Fruitvale Cannery. Note sharp curvature of track into plant and movements in and out of this plant require continued movements over busy plant crossing in. Fruitvale Station in center background of picture.

Dates

  • 1960

Language of Materials

Collection material in English

Conditions Governing Access

From the Collection:

Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.

Extent

4.5 cubic feet

Repository Details

Part of the Kheel Center for Labor-Management Documentation & Archives Repository

Contact:
227 Ives Hall
Ithaca NY 14853