Engine Terminal Lead, Penn Coach Yard, 1960
Scope and Contents
View looking south from engine terminal lead in the right foreground. Southward movements on No. 20 post office tracks are visible on the fireman's side only when the front end of the locomotive reaches the clearance point shown here due to supporting girders and enclosures similar to that on right, the end of which can be seen on the left border of picture. All tracks under this structure are wired with 11,000 volts overhead wires.
Dates
- 1960
Language of Materials
Collection material in English
Conditions Governing Access
Access to the collections in the Kheel Center is restricted. Please contact a reference archivist for access to these materials.
Extent
4.5 cubic feet
Repository Details
Part of the Kheel Center for Labor-Management Documentation & Archives Repository
227 Ives Hall
Ithaca NY 14853