Box 10
Contains 44 Results:
CLEO I Construction of component parts of the detector
A list of these photos with their media type and size is available upon request.
CESR Electrostatic Separator, various stages of construction, R. Lobdell, D. Morse, J. Kirchgessner, and others, no date
A list of these photos with their media type and size is available upon request.
Drawings of CLEO II
A list of these photos with their media type and size is available upon request.
Test Beam Apparatus, envelope dated August 1990
A list of these photos with their media type and size is available upon request.
Muon Chambers CLEO II Cosmic Ray Testing Station, 1991-09-06
A list of these photos with their media type and size is available upon request.
CLEO II During Assembly
A list of these photos with their media type and size is available upon request.
Inside CLEO II View of end of drift chamber and inner detector
A list of these photos with their media type and size is available upon request.
Loading CsI Crystals on truck at Newman Lab
A list of these photos with their media type and size is available upon request.
Corn. Univ. photo 850403-1-4A, -7A, 12A, 26A, -31A
A list of these photos with their media type and size is available upon request.
Electronics and testing CsI Crystals
A list of these photos with their media type and size is available upon request.